No products
New product
This standard defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I (Electrical & Instrument) installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).
Author | ANSI/ISA |
---|---|
Editor | ISA |
Document type | Standard |
Format | Paper |
Confirmation date | 2012-06-05 |
ICS | 35.240.50 : IT applications in industry
|
Number of pages | 30 |
Cross references | IEC 62382 (2006-11), MOD |
Weight(kg.) | 0.1510 |
Year | 2012 |
Document history | |
Country | USA |
Keyword | ANSI 62382;62382;ANSI/ISA 62382-2012 |